Skip to Content

About us

A Saudi company based in Madinah — local expertise with a direct German engineering partnership.

The company

Advanced Roads and Development Contracting Company (A.R.D SA) is a limited liability company registered in Saudi Arabia, , based in Al Eyun District, Madinah.

The company operates two parallel divisions: road construction and asphalt works on one side, epoxy flooring and surface preparation on the other. Its scope extends to bridges, tunnels, industrial construction and structural renovation.

What distinguishes the execution is that the plant is company-owned rather than rented, and its German origin is backed by an EU certificate of origin that anyone can verify independently — not merely asserted.

Vision, mission and objectives

Where we are going, what we commit to, and what we are working towards.

Vision

To contribute to Saudi Arabia Vision 2030 by providing innovative and sustainable infrastructure solutions that drive the Kingdom economic growth and environmental stewardship.

Mission

To deliver high-quality, sustainable construction solutions that meet the growing infrastructure needs of Saudi Arabia, while adhering to the highest global standards of quality and environmental responsibility.

Objectives

A trusted national provider

To establish ARD as a trusted provider of sustainable infrastructure solutions across Saudi Arabia.

Regional expansion

To expand operations into major regions including Riyadh, NEOM and the Red Sea, supporting the infrastructure goals of Vision 2030.

Durable and low-impact methods

To provide durable, innovative and environmentally responsible solutions for road construction, concrete milling, piling and tunnel excavation.

The German partnership

What it means in practice

Directly imported equipment

Industrial shot blasting machines and precision floor grinders, plus a complete 2025 asphalt train from Wirtgen, Vögele and HAMM.

EU certificate of origin

Certificate No. 39333716 from the Kassel-Marburg Chamber of Industry and Commerce names each machine by type and serial number, verifiable by any client until 12/2027.

European application expertise

Applicators certified by Sika Deutschland GmbH to the same standards applied on major European projects.

Organisation structure

The structure is built on job titles, not on individuals. Every box is a standing function with a defined scope and its own indicators, so the organisation remains valid when the people in it change.

Partners — General Assembly
Capital · annual budget · approval of fixed assets
Chief Executive Officer · Authorised Manager
Direction · targets · final pricing · strategic relationships
Finance and Corporate Support
  • Accounting and collections
  • Procurement and supply chain
  • HR and compliance

Correct numbers on time, every riyal collected

Operations and Sales
  • Western Region
  • Madinah
  • Central Region sales

Market converted into contracts executed

Technical Execution
  • Works supervision, all trades
  • Execution crews and foremen
  • Plant and equipment operation

Every trade delivered to quality first time, on programme

Quality, Health and Safety
  • Quality control
  • Occupational health and safety
  • Equipment and maintenance records

Control independent of execution

Business Development
  • Opportunity pipeline
  • Roads business development
  • Marketing and brand
  • Research and Development

Demand and product range development

How we are managed

Every project runs through the five PMI process groups, under documented controls.

Project lifecycle — PMI process groups

1 · Initiating

A project charter is approved before mobilisation: scope, deliverables, the project manager and the limits of their authority.

2 · Planning

Work breakdown structure, critical-path schedule, cost baseline, and quality, safety and procurement plans — completed before the first day of execution.

3 · Executing

Integrated change control: no change to scope is executed without an approved change order stating its effect on time and cost.

4 · Monitoring and controlling

Progress is measured against the baseline and reported to the client on a fixed cycle — planned versus actual, for both schedule and cost.

5 · Closing

Provisional and final handover with as-built drawings, material certificates, inspection reports and warranty, plus documented lessons learned.

Governance controls

Independence of control

Whoever executes does not certify his own work. Quality, health and safety sits outside the execution line and reports directly to the chief executive officer.

Segregation of duties

No single person raises a purchase order, receives the material and releases the payment. The three functions are separated without exception.

Live risk register

Reviewed weekly: probability, impact, planned response and a named owner for every risk — including weather, supply and traffic diversion.

Verifiable documentation

Asphalt works are documented with geographic location, date and time, so the client can verify progress without an intermediary.

Our team

Certified engineers and trained applicators, on site with full personal protective equipment.

ARD execution crew in full protective equipment

Execution crew in full protective equipment — helmet, high-visibility vest, gloves and respirator.

ARD crew preparing the shot blasting and grinding equipment

Crew preparing the shot blasting and grinding equipment before starting a floor.

ARD site briefing before starting work

Site briefing before work starts — scope, sequence and safety measures for the day.

Certifications and approvals

Certificate / approvalNumberValidity
ISO 9001:2015 — Quality managementMQM.QMS.2608021To 24 August 2027
ISO 14001:2015 — Environmental managementMQM.EMS.2608015To 24 August 2027
ISO 45001:2018 — Occupational health and safetyMQM.OHS.2608013To 24 August 2027
Balady qualification — Construction and buildingCER-2608-542To 13 August 2027
Balady qualification — Maintenance and operationCER-2608-543To 13 August 2027
Ministry of Municipalities and Housing classificationGrade 700Valid
Saudi Aramco approved vendor10116736Valid
MODON pre-qualified applicatorPQA JDH2-05-008Valid
Ministry of Investment licence132064603321977To 19 August 2027

The three ISO certificates are issued by ARS Assessment Private Ltd under UAF accreditation and IAF MLA membership; their approved scope covers the construction of roads, pavements, bridges, tunnels, buildings, tanks and water networks.

The fleet — fully owned, not rented

In the Kingdom — on site today

  • Wirtgen W200 F cold milling machine — 455 kW
  • Vögele SUPER 1800-5 asphalt paver
  • Hamm HD+ 90 VV vibratory roller
  • Hamm HP 280 pneumatic tyre roller
  • Skid-steer loaders, a small milling machine and a mechanical sweeper

German base reserve — shipped within 3 to 4 weeks

  • Ten Wirtgen cold milling machines: W 200 F · W 100 F · W 100 RI · W 50 RI (2) · W 350 E (3) · W 35 RI · W 350
  • Vögele SUPER 1800-5 asphalt paver
  • Two Hamm rollers: HD 90 VV and HP 280
  • Three Komatsu SK 714 skid-steer loaders
  • Radlader 5055 E electric loader
  • Eight trucks: 40 t (2) and 7.49 t (6)

Daily capacity

10,000 m² milled and the same again paved — so the programme never hangs on somebody else's machines being free.

Plus 25 further owned units at our base in Germany — shipped within 3 to 4 weeks when the scope grows.

From our work

  • Arterial roads returned to traffic without shutting the city down — cold milling and resurfacing within municipality projects in Madinah and Jeddah, executed by the company with its own engineers, field crews and owned fleet.
  • Preventive maintenance that adds years to pavement life — milling, paving, bituminous spraying and full-depth reclamation (FDR) on road corridors in Jeddah within a municipality project.
  • Asphalt works inside airport facilities — an environment that forgives neither a level error nor a late reopening.
  • Roads in the Makkah region — delivered inside some of the tightest working windows in the Kingdom.
  • Industrial epoxy floors for factories, warehouses and food plants — blasting, grinding and surface preparation before any coat, because a floor's life is decided before the first pail is opened.
  • A reference we did not write ourselves — Madinah Municipality plays, inside its own premises, a recording of our crew and machines at work as an example of good execution.

Statutory particulars

  • VAT number: 312444442100003
  • Mixed limited liability company, owned by ARD Kugelstrahltechnik GmbH & Co. KG (Germany, HRA 4993)
  • Local content (LCGPA): 13.07% for 2025
  • Head office: Madinah — Al Eyun District, 42331

Shall we begin?

Talk to our team for a complete technical and commercial proposal.

Our Projects Contact us